Maryland Hazardous Waste Site Information
SPARROWS POINT STEEL MILL
The presented information is listed in chronological order. Please review the individual documents for specific information:
- MDE Factsheet
-
-
-
Multimedia Consent Decree Annual Reports
-
EPA Letter to Severstal requesting IRM work plan for coke oven area, dated February 19, 2009.
-
-
EPA Letter to Severstal commenting on April 2009 Coke Oven Area IRM Work Plan, dated June 17, 2009.
-
Coke oven area special study Dual Phase Interim Measures: SVE, Air Sparging, and Groundwater Pumping Phase 1 (Pilot Testing), dated July 2009
-
-
EPA Letter to Severstal approving July 2009 Coke Oven Area IRM Work Plan, dated August 24,2009.
-
Severstal letter to MDE-Update on Recovery and Recycling of Iron Bearing and Concrete Materials Coke Point Landfill, dated September 11, 2009.
-
Work Plan Sediment, Surface Water, and Groundwater Sampling Plan to Assess Current Groundwater Discharge Impacts to the Offshore Environment, Dated October 2009.
-
Site Assessment for Proposed Coke Point Dredged Material Containment Facility at Sparrows Point-Maryland Port Authority, dated November 2009:
-
MDE Letter to EPA, dated January 7, 2010: Sparrows Point Particulate Sampling Proposal
-
-
Severstal Coke Oven Area Interim Measures Pilot Test Results and Prototype Systems Plan, dated January 2010.
-
Severstal Letter to MDE, dated January 27, 2010 and Site Compliance Evaluation Report.
-
Greys landfill, 2009 Groundwater Monitoring Report, dated January 15, 2010.
-
Severstal Interim Measures 2009 Annual Report: Former Sludge Bin Storage Area, Rod and Wine Mill, dated January 29, 2010.
-
EPA Letter to Severstal, dated February 3, 2010 with comments on the off site work plan, dated October 2009.
-
-
EPA Letter to Severstal, dated March 2, 2010 approving Cove Oven Interim Measures Prototype Systems Plan.
-
-
Coke Oven Area Interim Measures Pilot Test Results and Prototype Systems Plan Response to EPA Comment and Approval Letter, dated March 2, 2010.
-
Work Plan to Assess Offsite Ecological Impacts From Current Releases From the Five Special Study Areas, dated April 2010.
-
EPA Letter, dated May 3, 2010 to Severstal regarding corrective measures studies (CMS).
-
EPA Letter, dated May 26, 2010 to Severstal regarding Coke Point Interim Measures Work Plan Disapproval.
-
-
-
EPA Letter, dated June 30, 2010 regarding response to off-site sediment sampling dispute.
-
EPA Letter, Dated July 6, 2010 response to the Archdiocese of Baltimore Letter (attached).
-
-
-
EPA Letter Approving Coke Oven Interim Measures Work Plan, dated Septmeber 2, 2010.
- Interim Measures Progress Report, dated November 30, 2011.
- Interim Measures Progress Report, December 2011.
- Interim Measures 2011 Annual Report, Rod and Wire Mill, dated January 2012.
- Interim Measures Progress Report, dated January 2012.
- Interim Measures Progress Report, dated February 2012.
- Interim Measures Progress Report, dated March 2012.
- Interim Measures Progress Report, dated April 2012.
- Interim Measures Progress Report, dated May 2012.
- Interim Measures Progress Report, dated June 2012.
- Interim Measures Progress Report, dated July 2012.
- Interim Measures Progress Report, dated August 2012.
- Interim Measures Progress Report, dated September 2012.
January 13, 2011, EPA Revised Coke Point IRM approval Letter and Dispute Resolution.
- Interim Measures 2010 Letter and Annual Report Former Sludge Bin Storage Area, Rod and Wire Mill, dated January 2011.
- Coke Oven Area Interim Measures Cell 3 "Cove" Area Air Sparge/Soil Vapor Extraction System Design Report, dated March 1, 2011.
- Coke Oven Area Interim Measures Cell 4 In-Situ Anerobic Bio-Treatment System Design Report, dated March 31, 2011.
-
-
Severstal Sparrows Point, LLC name change to RG Steel Sparrows Point, LLC letter, dated April 21, 2011.
-
- Documents from July 5, 2011 Off-Site Sampling Dispute Resolution Decision, Judge J. Frederick Motz, Unites States District Court
Sparrows Point Shipyard Factsheet
Documents Submitted to the Court on 12/28/11 as Developed in the Dispute Resolution Process:
Public Meeting June 24, 2010 MDE/EPA presentations and associated information:
-
-
-
-
-
Please click here for information on the proposed Sparrows Point Works Industrial Waste Landfill "New Landfill"
-
Maryland Port Authority Coke Point Risk Assessment
If you have question or require assistance related to the above material, please contact Ms. Barbara Brown at 410-537-3493 or email to bbrown@mde.state.md.us.
| Acrobat® Reader is required to view and print the PDF files. If you do not have it click on the icon to the right. |
 | |
 |
|